Richard Lee Holsberry 

Last updated:  07/30/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received

201 Riverview Drive
Dayton, TN  37321
US

Mobile: 423-298-8737   
Home:
423-285-5030
Secondary Mobile/Cell:
423-285-0012
rlholsberry@hotmail.com

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Project Controls Specialist 2015

Resume Value: p4jx8qkwnhzszbza   

  

 

 

RICHARD L. HOLSBERRYPAGE 1

 

 

Permanent Address:

201 Riverview Drive 

Dayton, TN  37321 

Telephone:

423-298-8737    Mobile

 

SUMMARY  

Seven years’ experience as Journeyman, Master Electrician.  Twenty Nine years experience as a Principle in Project Controls, Project Planning, Cost Controls, Estimating and Resource Allocation Manager. Seven Years Experience in DOE Construction, Environmental Decommissioning and Restoration, Eighteen Years Commercial Construction Projects, Industrial Projects, Fossil Power Plants Construction and Major Modifications. Nuclear Power Facilities Construction, Startup & Forced Outages. 

 

EXPERIENCE:

Nuclear Technical Services

1920 E 17th St, Idaho Falls, ID 83404
April 2015 to Current

Hanford Nuclear Reservation

Sr Project Controls Specialist

 

•     Performed Project Controls Scheduling and Forensics utilizing Acumen Fuse analysis of schedule data, cost information, risk models, earned value and project performance.

•      Performed in-depth investigations with construction managers to ascertain & document reasons for modification, claims, administration.

•       Develop and maintain out year Resource Loaded CPM progress and performance schedule for Washington River Protection Site

 

 

 

Peak Solutions

409 Palomino Drive, Amarillo, TX  79118

November 2013 to April 2015

Portsmouth Nuclear Site

Project Controls Specialist

 

•     Performed technical (REA) Request for Equal Adjustments expertise (Project Controls Forensics) with regard to technical analysis of construction modifications estimates & claims for overruns by contractors.

•      Performed in-depth investigations with construction managers to ascertain & document reasons for modification, claims, administration.

•      Assigned the responsibility for preparing Findings of Fact, estimation/cost analysis, schedule analysis using latest version of Recognized Estimating and scheduling software such as Means & Primavera (P6)

 

 

 

Restoration Services Inc.

Highway 58 at Flannigan's Loop Rd, Oak Ridge, TN 37830

January 2012 to February 2013

TVA NUCLEAR POWER DIVISION

TVA FOSSIL POWER PLANTS

PRINCIPLE PROJECT CONTROLS SCHEDULER

 

         Develop and maintain Resource Loaded CPM progress and performance schedule for Appendix “R” Modification’s (NRC Commitment)

         Develop and maintain Resource Loaded  CPM progress and performance schedule for Fukushima Related (NRC Commitment) Modification’s for Seven Nuclear Power Plants

         Develop Schedules utilizing for Twelve Fossil Power Plants Modification’s

         Provide timely Performance Assessments for all Project Modification’s. 

         Responsible for timely schedule forecasts utilizing established power group forecast methodologies and work processes in Primavera Enterprise 6.2.

         Provide timely variance analysis and an early warning to management on critical or near critical activities.  Provide corrective action plans as required.

         Actively contribute to the Risk Management Process

         Align with client and maintain excellent client relations

 

Pinnacle Inc.

5501 Lyndon B Johnson Fwy • Suite 600 • Dallas, TX • 75240

August 2011 to November  2011

LUMINANT POWER – SANDOW & OAK GROVE POWER STATIONS

PRINCIPLE OUTAGE PROJECT CONTROLS ENG

 

·               Develop and maintain CPM progress and performance, schedule, and cost baselines for the project   Shutdown, Construction & Startup scopes of work

·               Provide timely Performance Assessments for all Project Modification’s. 

·               Responsible for timely and accurate cost and schedule forecasts utilizing established power group forecast methodologies and work processes Primavera Enterprise 6.2.

·               Provide timely variance analysis and an early warning to management on critical or near critical activities.  Provide corrective action plans as required.

·               Actively contribute to the Risk Management Process

·               Align with client and maintain excellent client relations

 

 

 

 

 

 

 

 

 

Peak Solutions

409 Palomino Drive, Amarillo, TX  79118

March 2011 to July 2011

Portsmouth Nuclear Site

Subject Matter Expert

 

·   Performed technical (REA) Request for Equal Adjustments expertise (Project Controls Forensics) with regard to technical analysis of construction modifications estimates & claims for overruns by contractors.

·   Performed in-depth investigations with construction managers to ascertain & document reasons for modification, claims, administration.

·   Assigned the responsibility for preparing Findings of Fact, estimation/cost analysis, schedule analysis using latest version of Recognized Estimating and scheduling software such as Means & Primavera (P6)

 

 

Peak Solutions

409 Palomino Drive, Amarillo, TX  79118

Aug 2010 to Feb 2011

Nevada National Security Site

SR  PROJECT CONTROLS ENG

·   Performed technical expertise Project Controls Forensics with regard to technical analysis of construction modifications & claims & analysis of construction project schedules using current technologies.

·   Performed periodic job visits to projects within my assigned areas during various stages of construction to observe, document, & ensure scheduling activities are performed in compliance with stated requirements & criteria (Earned Value).

·   Performed in-depth investigations to ascertain & document reasons for modification, claim, and administration or scheduling errors.

·   Assigned the responsibility for preparing Findings of Fact, estimation/cost analysis, schedule analysis using latest version of Primavera (P6) at the Nevada National Security Site

 

Pinnacle Inc.

5501 Lyndon B Johnson Fwy • Suite 600 • Dallas, TX • 75240

September 2009 to May 2010

LUMINANT POWER – SANDOW POWER STATION

PRINCIPLE OUTAGE PROJECT CONTROLS ENG

·               Develop and maintain CPM progress and performance, schedule, and cost baselines for the project   Shutdown, Construction & Startup scopes of work

·               Provide timely Performance Assessments for all Project Modification’s. 

·               Responsible for timely and accurate cost and schedule forecasts utilizing established power group forecast methodologies and work processes Primavera Enterprise 6.2.

·               Provide timely variance analysis and an early warning to management on critical or near critical activities.  Provide corrective action plans as required.

·               Actively contribute to the Risk Management Process

·               Align with client and maintain excellent client relations

 

 

Fluor 

100 Fluor Daniel Dr, Greenville, SC 29607

September 2008 to July 2009

Fluor – Oconee Nuclear Power Station, Seneca,  SC

Project Controls Manager 

 

·               Field Project Controls Manager for the Oconee Nuclear Power Station Project

·               Work with functional management to define requirements, recruit, and develop staff members for the life of the project.  This includes but is not limited to mentoring or coaching of junior staff members.

·               Develop and maintain progress and performance, schedule, and cost baselines for the project for both Construction & Commissioning scopes of work

·               Provide timely Performance Assessments for all construction Project Controls Personnel. 

·               Responsible for all aspects of the Change Management system

·               Responsible for timely and accurate cost and schedule forecasts utilizing established power group forecast methodologies and work processes Primavera 3.1.

·               Review and approve estimates from ROM thru Final Issue for construction.

·               Responsible for timely and accurate financial (PMAR/margin) forecast for Oconee Nuclear Power Station Project

·               Provide timely variance analysis and an early warning to management on critical or near critical activities.  Provide corrective action plans as required.

·               Contribute to Portfolio assignments as required by functional management.

·               Actively promote participation in Project Controls Knowledge Community

·               Actively contribute to the Risk Management Process

·               Align with client and maintain excellent client relations

 

High Bridge Assc.

3260 Pointe Parkway , Suite 200, Norcross, Georgia 30092

July 2007 to September 2008

HBA-INC – Department Of Energy, Oak Ridge, TN

Sr. Project Management Consultant

·   As part of DOE Headquarter Integrated Project Team I am creating a Complex wide integrated schedule containing in excess of 200,000 CPM Logic driven tasks utilizing Primavera Enterprise 6.0

·   Assist DOE Federal Project Directors with updating and progressing projects on a routine basis

·   Provide coaching and mentoring to DOE staff in Scheduling/Cost Controls.

·   Assist DOE Oakridge in reviewing/preparing contractors, Bechtel Jacobs (BJC) at ETTP Site, Foster Wheeler Environmental Corporation (FWENC) at the TWP Site, (BJC) at Y-12 National Security Complex, and (BJC) at Oak Ridge National Labs for (IPR) Independent Project Reviews plus (EIR) External Independent Reviews to Certify near term performance baseline of the Environmental Management Program. Also assess the reasonableness of the (OPER) Out -Year Planning Estimate Range

·   Creating Schedules for Complex Wide Waste Transportation

·   Assigned as lead scheduler for Portsmouth, Ohio and Paducah, KY D&D Sites containing over 30,000 activities.

 

 

MWH Global, Inc, 370 Interlocken Blvd, Suite 300, Broomfield, CO 80021

Jan 2007 to June 2007

MWH – Army Core of Engineers, Portland, OR

Sr. Project Management Consultant

·   Assist Client project and program teams with project initiation

·   Assist Client project managers with updating and progressing projects on a routine basis

·   Provide coaching and mentoring to client staff in scheduling basics, the client’s P2 System, and the use of Primavera Enterprise Software

·   Assist client in identifying competency gaps and recommend solutions to close gaps

·   Assist project delivery teams with work-break-down, schedule development, resource identification and planning, loading of projects and resources, schedule modification and maintenance

·   Assist local help desk with calls/issues related to the client’s P2 system and Primavera software.

 

Project Services Group, LLC (PSG), 780 Buford Hwy Suite 202 A, Suwanee, GA
Feb 2006 to Jan 2007
Project Solutions Group – Bechtel Vitrification Plant, Hanford, WA

 

Sr.  Project Estimator Trending  ( 7 Months )

 

·   Project Control Organization:

·   Create estimates for Engineering identified trends that were not with-in initial or present scope of work.

·  Core Group Sr. Scheduler

·   Perform Analysis on 50,000 + activity schedule for errors and have schedulers make corrections to conform to EVM Standards.

·   Vice President of NW Division for (PSG) Project Services Group

·   Managing recruitment, contracts, and personnel employed by PSG.

 

 

Stragic Management Solutions Inc – Pantex DOE Site, Amarillo, TX

Oct 2005 to Feb 2006

Sr.  Project Estimator

·   Capital & Expense Projects Division:

·   Responsible for Creating Multidiscipline Estimates for Replacement Value of existing facilities that were constructed in the 1940 time frame. The estimates ranged in $150 Million to $200 Million for Replacement Construction based upon current Material & Labor Rates.

 

July 2005 to Oct 2005
Sun Technical Services – Browns Ferry Nuclear Power Station, Athens, AL

Sr.  Project Estimator

·   Modifications Division:

·   Responsible for the development of Estimates for Modification Performance Errors (PERs) reporting  man-hours required for re-performance of repairing errors made by craft during construction. Also responsible for variance analysis of indirect man-hour charges.

 

 

September 2004 to July 2005

Complex Technical Services – Pantex DOE Site, Amarillo, TX

Sr.  Project Management Consultant

Capital & Expense Projects Division:

·   Responsible for the development, maintenance, updating and performing / explaining variance analysis of the engineering, procurement, fabrication, implementation, startup and testing schedules for plant modifications and major projects.  Assist in the migration of project schedules from Primavera’s P3v3.1 to P3ec application software.

 

November 2003 to August 2004

Team Associates, LLC – Dayton, TN

Latin America General Electric Project Control Manager.

·   Assigned as the Manager of the Project Controls personnel throughout Latin America for General Electric Co, Electrical Power Plant Installation and Maintenance

·   Maintained Schedules and Financials for all generator up-rates over $250,000 including Nuclear, Fossil, and Hydro Power Stations. Maintained Templates for schedules and maintained history files on each project utilizing Primavera P3ec Enterprise and ePC for the updating and tracking financials for the P3ec projects.

 

November 2001 to November 2003

Team Associates, LLC – Brownsville, TN

Project Lead Scheduler

·   Maintained Master Schedule (P3) for construction & Start-up of four each Simple Cycle Combined Fuel Oil & Natural Gas Fired General Electric Generators at TVA Site.  Provided oversight of Contractors Schedules Civil, Electrical, Mechanical, Structural, Tank Fabricators, Fire Protection, Painters and Startup Schedules that I integrated into the Master Schedule on a weekly basis.  Performed analysis and Provided Reports to Management of GE and TVA.

 

January 2001 to November 2001

Foster Wheeler Corporation – DOE Site Fernald, OH

Project Lead Scheduler

·   Worked with a Red Team to develop schedules (P3) for construction of a facility to remove heavy metals from a tank farm and process it into yellow bricks for permanent storage at a Nuclear Waste Storage Facility.  After completion of this task was reassigned to the home office in Norcross, GA as Lead Electrical Estimator working on many Production Type Facility Estimates.

·   Was a Consultant with the company for two years after leaving full time employment.

 

February 2000 to January 2001

Bechtel Telecommunication Frederick, MD 

Project Scheduling Supervisor

·   Direct production of a FY00 through FY03 Baseline Schedule and a Lifecycle Integrated Master Schedule conforming to the American Telephone & Telegraph (ATT) Wireless System Build Plan for constructing 9,000 new cellular wireless communication base station sites. Supervised 42 Market Cities Project Controls Personnel in providing Level I, II and III schedules and curves for Bechtel Project Management Reviews and ATT approval.  Created desktop Guide (Business Process) for project controls personnel.  Created Procedures for Integration of ATT Scheduling System Software into a Bechtel Format.  Direct daily activities necessary to support scheduling/cost functions.  Trained Functional & Business Managers in the processes required for updating weekly status.

 

September 1999 to February 2000

Westinghouse Chemical Weapons Incinerator   

Integrated Master Schedule

·   (EVMS) Earned Value Management System. Produce and Plot Level I, II and III schedules for Project Management Reviews and Army Corp of Engineer approval.  Create desktop Guide (Business Rules) for all project controls personnel.  Direct daily activities necessary to support scheduling/cost functions. Trained Control Account Managers in the processes required for IBR certification in the use of EVMS standards.

 

August 1999 to September 1999              

TVA Muscle Shoals Power Service Shops

Planner Cost Estimator/Scheduler GUBMK Partnership

·   Develop & Implement an in house estimating process specifically for Fabrication Shop, using Timberline commercial estimating software.  Create Work Breakdown Structure for Fabrication Shop Estimates.  Develop & Implement performance tracking goal data.  Estimate required quantities for Bid Packages, and plan work to meet start of construction dates.  Used Empirical Data to develop average unit rates, standard deviations, etc for families of projects.  Instruct Planners & others on the use of the estimating process.

 

April 1998 to July 1999

Hanford Plutonium Finishing Plant                              

Project Manager Babcock Wilcox /Informatics Corp Contractors

·  Manage Schedulers, Estimators, and Contract Buyers Personnel in day to day business.   Scheduling Field Lead for DOE TIGER TEAM Estimating/Scheduling for multi-year $180,000,000. Decommissioning of Plutonium Finishing Plant Project.

 

February 1998 to April 1998

Hanford Decommissioning Project  “K” Basin        

Developer / Instructor DOE ABC Type Estimating

·   Assisted in development of ABC Estimating Guide, Instructed “K” Basin DOE Managers and Cost Account Managers in development of the ABC type estimates for decommissioning multi-year projects. Also assisted in the development of the estimates.

 

October 1997 to February 1998

South Texas Project Power Plant

Software  Application Team Senior Lead Scheduler

·   Modified Schedule of Software Change-out for entire plant accounting, payroll and budget software system to support new ownership, including incorporating Resources of required programmers to enable completion of the project on time (31 Dec. 1997).  Facilitate and Lead weekly status meetings to inform management of requirements to be initiated in time for converting ownership.

 
May 1996 to October 1997
RMI Demolition and Decommission Project

Senior Project Control Engineer

·   Created and implemented a 10 year resource loaded schedule Primavera P3, $150 million Timberline Assembly’s estimate and cost control system (Micro frame) for decontamination/demolition/decommissioning a DOE facility in Ashtabula, Ohio.  As this development was in process we maintained then existing program for project controls and reporting.  Also developed several estimates for utilizing new cleanup technology such as, Soil Washing, Metals Wicking and Planting Various Crops to serve as a wick for heavy metals.

 
May 1991 to May 1996
TVA-Watts Bar Nuclear Power Plant

Engineering Organization/Senior Project Control Engineer

·  Assisted in establishing a Project Control (P2) system for the Engineering Dept. that created achievable milestones integrated with Modifications Org. (P3), Startup Org. (P3) and Plant Maintenance Org. (MTS) to allow budget, material & engineering to be in place at required time of work implementation to successfully complete the project in the established time frame & on budget.

 

Startup Organization/Senior Project Control Engineer

·   Developed & Implemented a spreadsheet (Lotus) that tracked progress on the testing of 32,000 plant components, also had to integrate this with the Master Baseline Schedule (P2).  Utilizing production, schedule, and regulatory requirements, various reporting mediums were used to provide a comprehensive management report that was used for identification and resolution of restraints to completion.  Additionally, cost analysis (freelance) was done on a periodic basis for all re-projections and changes to the manpower requirements.

 

Modifications Organization/Senior Project Control Engineer

·   Created schedule for punch list items to bring plant reactor to critical mass for online use.  Also estimated number of craft required to complete task to allow for gradual layoff of 1,500 construction craft along with 800 support personnel.  Attended two daily meetings with plant VP and managers to report/ defend reasons for number of craft still employed by Modifications.

 

May 1990 to May 1991

Palo Verde Nuclear Power Station 1, 2, & 3

PSC Management Organization/Senior Project Estimator

·   Implemented the use of (Timberline) estimating software for integrating (Premise) Schedule/Cost program for out yearlong term construction, maintenance and plant outage requirements with preset budgets.  Provided task/engineering analysis for cost savings approaches to complete the projects identified.

 
March 1990 to May 1990
Port Everglades Fossile Power Plants 1,2, & 3

FP&L Management Organization/Senior Project Estimator

·   Provided detailed multi-discipline estimates Lotus 123 for a fossil fuel 750 Mega watt power plant overhauling the boiler and related components.  Also assisted in a prudence audit at the completion of the project locating and identifying an overcharge in the amount of $1.2 million.

 

May 1989 to March 1990
Fort St. Vrain Nuclear Power Plant

PSC Management Organization/Senior Project Electrical Estimator

·   Created estimating and cost control program for Defueling Storage of Spent Fuels Rods, decontaminating & decommissioning of the facility.  Additionally developed conceptual estimates Timberline for converting the Plant to a fossil fired boiler unit.  Worked directly for the Senior Vice President to advise him daily of cost averages and predictions for future cost.

 

September 1987 to May 1989

Turkey Point Nuclear & Fossil Power Stations

FP&L Project Control Organization Senior Project Electrical Estimator

·   Created estimates (Lotus) back fit construction projects to allow plant licenses to be extended for 20 years operation.  Developed the first Project Control Engineer position that allowed for using personnel to be tasked with scheduling (P2), estimating and cost engineering as one.

 
October 1985 to September 1987
Holmes & Narver Engineering

Senior Level III Electrical Estimator Project Controls Organization

·   Worked with engineers to develop electrical estimates (Lotus) for a Multibillion $ construction of an Air Force Base.  Additional requirements were Quality Assurance of drawings, check for constructability.  The scope of work as a level III Estimator was to manage the lower level estimators in their daily assigned duties along with reporting to upper management of any potential problem areas encountered.  Managed a staff of 12 onsite & inter-office lower level estimators.  All of the project estimates were DOE & DOD construction that ranged from Multibillion $ down to $100,000 contracts.  The estimating tools used were Saylor, Means, Richardson’s, & California Institute of Estimating.  These estimates were from conceptual to final or as built types.

 


 

EDUCATION, TRAINING & CERTIFICATIONS

 

 

·               Completed Several Higher Education Courses, Completed International Brotherhood of Electrical Workers Apprenticeship Program

·               Certified Electrical Master Electrician, Certified Blue Print Reading Courses, Certified NECA Foremanship Course, Certified Welder, Certified Motor Controls Technician, Certified Optical Fiber Technician, Certified Richardson Eng. School of Estimating (Construction & Process Facility)

·               Certified Trade Services Estimating Courses,

·               Certified California Institute of Construction Estimating

·               Certified PRIMAVERA P6 Scheduling, Several Revisions to Current 6.14

·               Certified Humphreys & Associates EVM Systems

·               Certified PRIMAVERA P3ec Scheduling,

·               Certified Performance Analysis

·               Certified Risk Management

·               Certified 10 Hour OSHA Safety Course

 
 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Project Controls Specialist

Babcock Services Idaho Inc

- Present

 

Additional Info

BACK TO TOP

 

Desired Salary/Wage:

73.00 USD hr

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

More than 15 Years

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

Inactive Clearance

US Military Service:

Yes

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Project Controls Specialist

Alternate Target Job Title:

P6 Scheduler

Desired Job Type:

Temporary/Contract/Project

Desired Status:

Full-Time
Per Diem

 

Target Company:

Company Size:

Industry:

Agriculture/Forestry/Fishing
Energy and Utilities
Construction - Industrial Facilities and Infrastructure
Aerospace and Defense
Waste Management
Staffing/Employment Agencies
Government and Military

Occupation:

Building Construction/Skilled Trades

·         General/Other: Construction/Skilled Trades

Marketing/Product

·         Brand/Product Marketing

Project/Program Management

·         General/Other: Project/Program Management

·         Project Management

 

Target Locations:

Selected Locations:

US-FL-West Palm Beach
US-KY-Bowling Green/Paducah
US-NC-Charlotte

Relocate:

Yes

Willingness to travel:

Up to 100%

 

Languages:

Languages

Proficiency Level

Spanish

Intermediate